The market ramp-up of the cumulative electrolysis capacity is shown for selected regions. Facilities offshore are only considered when Germany is selected.
153 PtX plants are in operation, in the planning phase or decommissioned in the selected regions. Facilities offshore are only considered when Germany is selected.
Name sorted, ascending | Location | Year |
MW
info Green Production (MW) | Product | |
---|---|---|---|---|---|
AEM Multicore Bioenergiepark | Saerbeck | 2023 | 1.0 | H2 | info product:
H2 Projekt-/bzw. Anlagenstart: 2023 Conversion: Anion Exchange Membrane Electrolysis Status: operational |
Aqua Primus 2 | Helgoland | 2025 | 28.0 | H2 | info product:
H2 Projekt-/bzw. Anlagenstart: 2025 Status: under construction |
Aqua Ventus | Nordsee, Doggerbank | 2035 | 10000.0 | H2 | info product:
H2 Projekt-/bzw. Anlagenstart: 2035 Status: concept |
AquaSector | Deutsche Bucht | 2028 | 290.0 | H2 | info product:
H2 Projekt-/bzw. Anlagenstart: 2028 Status: feasibility study |
AsH2Gas | Weilheim-Schongau | 2018 | 0.3 | CH4 | info product:
CH4 Projekt-/bzw. Anlagenstart: 2018 Conversion: Biological Methanation |
AWG Wuppertal | Wuppertal | 2023 | 2.0 | H2 | info product:
H2 Projekt-/bzw. Anlagenstart: 2023 Conversion: PEM Elektrolysis Status: operational |
bioCO2nvert | Dörentrup | 2019 | 0.1 | null | info Projekt-/bzw. Anlagenstart:
2019 Conversion: Anion Exchange Membrane Electrolysis with biological Methanation |
bioFarm | Straubing | 2023 | 0.1 | CH4 | info product:
CH4 Projekt-/bzw. Anlagenstart: 2023 Conversion: Anion Exchange Membrane Electrolysis with biological Methanation |
Biogasbooster | Straubing | 2014 | 0.3 | CH4 | info product:
CH4 Projekt-/bzw. Anlagenstart: 2014 Shutdown: 2017 Conversion: Biological Methanation Status: decomissioned |
BioPower2Gas | Allendorf (Eder) | 2013 | 0.3 | CH4 | info product:
CH4 Projekt-/bzw. Anlagenstart: 2013 Conversion: PEM Elektrolysis with biological Methanation |