Evaluation of Inventory

Market Ramp-up

The market ramp-up of the cumulative electrolysis capacity is shown for selected regions.

Locations in Selected Regions

182 PtX plants are in operation, in the planning phase or decommissioned in the selected regions.



Name
Location
Year
MW
info
Product
AEM Multicore Bioenergiepark Saerbeck 2023 1.0 H2
info
Aqua Primus 2 Helgoland 2025 28.0 H2
info
Aqua Ventus Nordsee, Doggerbank 2035 10000.0 H2
info
AquaSector Deutsche Bucht 2028 290.0 H2
info
AsH2Gas Weilheim-Schongau 2018 0.3 CH4
info
Audi e-gas Werlte 2013 6.0 CH4
info
AWG Wuppertal Wuppertal 2023 2.0 H2
info
BayH2 Vohburg - 128.0 H2
info
bioCO2nvert Dörentrup 2019 0.1 null
info
bioCONNECT Lemgo 2016 - CH4
info
1-10 of 182